Planning philosophy
Model What Matters: The Four Pillars of Effective FP&A
Why modeling more is not always better, and how to balance functionality, maintenance, performance, and user experience.
The temptation to model everything
Most planning models grow in one direction: more detail. A new cost center gets its own tab, a product line gets its own driver, a manager asks for one more split. Each addition is reasonable. Together they produce a model that takes a week to update, that only one person understands, and that nobody fully trusts.
Detail feels like accuracy. It is not. A forecast built from 3,000 lines is not more reliable than one built from 300 if the extra lines rest on guesses. What extra detail reliably adds is work: more inputs to collect, more formulas to check, more places for an error to hide.
The value is not in the model you build, but in the decisions it helps you make.
Every part of a plan should earn its place by supporting a decision someone will actually make: hire or wait, raise prices or hold, spend or delay.
“Plans are worthless, but planning is everything.”
The plan itself will be wrong within weeks. What lasts is what the organization learned while building it: which assumptions matter, where the risks are, and who owns which number. A model too heavy to rework gets in the way of that learning.
Four pillars for judging a planning model
A useful way to test any design choice, from a single line to an entire application, is to look at it through four pillars. They pull against each other, and a good model balances them rather than maximizing one.
Functionality
Does the model answer the questions the business asks? Can it produce the budget, the forecast and the comparison with actuals at the level managers need? The push for more detail usually comes from here, and it is the pillar most often given too much weight.
Maintenance
How much effort does it take to keep the model correct? Every new dimension, mapping and exception has to be updated when the organization changes: a new cost center, a reorganization, a new chart of accounts. If only one person can maintain the model, maintenance is already a risk.
Performance
How quickly does the model calculate, open and consolidate? A model that takes minutes to recalculate discourages the scenario work that planning is for. Performance problems usually grow with detail, not with the number of users.
User experience
Can the people who enter and read the numbers do so without help? Budget holders who struggle with an input template make mistakes, enter numbers late, or quietly keep their own spreadsheet beside it.
Ask all four questions before adding detail. “We could model it” answers only the first.
Detail multiplies
The cost of detail is rarely linear. Each dimension multiplies the number of values the model has to hold, and every value has to be entered, calculated or checked.
| Model shape | Values to plan |
|---|---|
| 40 accounts × 12 months | 480 |
| × 25 cost centers | 12,000 |
| × 300 products | 3,600,000 |
The first two steps are manageable for most finance teams. The third is a different kind of model: it needs a data feed, not a template, and few of those 3.6 million values will ever be reviewed by a person. Before adding a dimension, ask who will look at the numbers it creates.
Choosing the right level of detail
Most planning lines can be planned at one of four levels. The right level depends on the line, not on the model as a whole.
| Level | What it means | Works well for | Watch out for |
|---|---|---|---|
| Account | One amount per account and period | Small or stable costs, first budget drafts | Hides who is responsible for the number |
| Cost center | Accounts split by responsible unit | Costs a manager controls and is measured on | Many small cost centers create entry work with little insight |
| Driver | An amount calculated from a quantity and a rate, such as headcount × average salary | Lines driven by a few measurable factors | Drivers that are unstable, or not measured in actuals, cannot be checked |
| Transaction | Individual items, such as each hire, contract or invoice | A small number of large, known items | Volume: maintenance and performance suffer quickly |
One plan can mix levels. Payroll may be planned by driver, rent by contract, travel by account, and a large capital project item by item.
A decision table for each line
To choose the level for a line, work through these questions in order and stop at the first answer that settles it.
| Question | If no | If yes |
|---|---|---|
| 1. Is the line material to a decision this year? | Plan it by account, or as one total | Go to question 2 |
| 2. Is one person responsible for it and able to act on it? | Keep it by account and name an owner first | Plan it by cost center at least, then go to question 3 |
| 3. Is it a small number of large, known items, such as contracts, projects or key hires? | Go to question 4 | Plan it item by item |
| 4. Does it follow a few measurable drivers that also appear in actuals, through a relationship that holds over the year? | Plan the amount directly | Plan it by driver, and update the driver values in each forecast |
“Material” depends on the business. A practical test is whether a plausible error in the line would change a decision. If it would not, the line does not need more detail.
The table sets how much detail a line needs, not how its amount is justified. Lines planned as amounts are where “last year plus five percent” creeps in. For discretionary spend such as marketing, travel or consulting, consider building the amount from zero every few years, one category at a time, rather than carrying last year forward.
What to automate, and what to leave to people
Automation reduces maintenance and errors when the rule is stable. It adds risk when it hides a judgement.
Automate
- Loading actuals from the accounting system
- Currency translation with agreed rate sets
- Totals, subtotals and consolidation
- Allocations that follow a stable, written rule
- Rolling the plan forward to the next period
Leave to people
- Assumptions that need judgement: prices, growth, hiring
- One-off events: a new contract, a restructuring, a large order
- Lines too small to be worth a rule
- Anything whose logic changes every cycle
A useful test: if you cannot write the rule down in one sentence, do not automate it yet.
Start simple, then add detail where it pays
- Start each line at the coarsest level that supports the decisions it informs.
- Add detail only when someone will review the numbers it creates.
- Test every addition against all four pillars, not just functionality.
- Prefer drivers that also appear in actuals, so the plan can be checked.
- Review the model’s detail once a year and remove what nobody used.
A lean model is not a compromise. It is quicker to update, easier to trust, and it leaves the team time for the part of planning that matters most: discussing what the numbers mean.
Keep reading
Multi-Currency Budgeting in an Inflationary Environment
Variance Analysis When Exchange Rates Move
Coming soon